Skip to content
HighSpans Engineering, Inc.HighSpans Engineering, Inc.
  • Home
    • Who We Are
    • Our Services
    • Our Mission
    • Our Vision
    • FDOT Pre-Qualification
  • Business Units
    • Civil Engineering
      • Structural Design
      • Highway Design
      • Traffic Operations Design
    • Construction Engineering Inspection
    • Geotechnical Engineering
    • Materials Testing
    • Specialty Engineering
  • News
  • Resources
    • Federal Agencies
    • FDOT
    • Professional Organizations
    • Professional Publications
  • Team
    • Strategy
    • Positions
    • Benefits
  • Contact Us
Menu Close

4.1.2

  1. Home>
  2. >
  3. Structural Engineering>
  4. 4.1.2
Downtown Basin Retaining Walls & Pedestrian Bridge

Downtown Basin Retaining Walls & Pedestrian Bridge

Fort Myers Country Club Bridge Repairs

Fort Myers Country Club Bridge Repairs

Alafia River Bridge

Alafia River Bridge

Fleming Key Utility Bridge Reconstruction

Fleming Key Utility Bridge Reconstruction

Pan American Blvd Bridge Hydraulic and Structural Bridge Study

Pan American Blvd Bridge Hydraulic and Structural Bridge Study

Skyplex Blvd Bridge

Skyplex Blvd Bridge

iRox – I75 Widening Bridges

iRox – I75 Widening Bridges

Contact Info

  • 2121 McGregor Blv. - Suite 200Fort Myers, Florida 33901
  • Phone:239-433-3000
  • Fax:888-449-2462
  • Email:Engineers@HighSpans.comOpens in your application
  • Website:HighSpans.com

Site Menu

  • Home
  • Construction Engineering Inspection
  • Civil Design Engineering
  • Geotechnical Engineering
  • News
  • Resources
  • Team
  • Contact Us

Recent Projects

  • Big Carlos Pass Bridge Replacement
    Big Carlos Pass Bridge Replacement
    January 17, 2024/
    0 Comments
  • Collier 11 Bridges Replacement
    Collier 11 Bridges Replacement
    January 17, 2024/
    0 Comments
  • FDOT Materials Testing Contract Districts 1&7
    FDOT Materials Testing Contract Districts 1&7
    January 17, 2024/
    0 Comments

Recent Posts

  • Big Carlos bridge approved $285 million project is set to include bike and pedestrian lanes
    Big Carlos bridge approved $285 million project is set to include bike and pedestrian lanes
    June 14, 2023/
    0 Comments
  • Discover the Thrill of Fishing at Matlacha’s Bat House Park
    Discover the Thrill of Fishing at Matlacha’s Bat House Park
    June 14, 2023/
    0 Comments
  • What’s Happening in the Everglades City Area
    What’s Happening in the Everglades City Area
    June 14, 2023/
    0 Comments
Copyright 2025 - HighSpans Engineering Inc. All rights reserved.
  • Home
    • Who We Are
    • Our Services
    • Our Mission
    • Our Vision
    • FDOT Pre-Qualification
  • Business Units
    • Civil Engineering
      • Structural Design
      • Highway Design
      • Traffic Operations Design
    • Construction Engineering Inspection
    • Geotechnical Engineering
    • Materials Testing
    • Specialty Engineering
  • News
  • Resources
    • Federal Agencies
    • FDOT
    • Professional Organizations
    • Professional Publications
  • Team
    • Strategy
    • Positions
    • Benefits
  • Contact Us