Fort Myers Country Club Bridge Repairs

Time: 2020 – 2020
Owner:
City of Fort Myers
Construction Cost:
$40k
Role:

Summary of work performed:HighSpans served as Engineer of Record performing structural analysis, inspection, and conceptual design to address cracking and general deterioration of 3 existing concrete bridges (B3, B6, and B8) crossing unnamed canals at Ft Myers Country Club

 

Fort Myers Country Club Bridge Repairs