Weir WCS-101, City of North Port

Time: 2013 – 2014
Owner: City of North Port
Construction Cost: $1.5M
Role: EOR for Value Engineering
Summary of work performed:

Design of a steel sheet pile retaining wall with heavy duty concrete caps and columns to support earth and water loads as well as personnel, gate actuator equipment and monitoring equipment loads. Design was in accordance with AASHTO LRFD and FDOT SDG for a 75-year design life.

 
Weir WCS-101, City of North Port