Start – Finish: July 2015 – November 2018
Construction Cost: $404,719.45

Summary of work performed:
EOR for the FDOT funded LAP to add a left turn lane at Six Mile Cypress Southbound.  Project consisted of civil/traffic and structural engineering services for the construction of a left turn lane at the intersection of Veronica Shoemaker Blvd. SB and Colonial EB as well as a right turn lane from Veronica Shoemaker Blvd SB to Colonial Blvd WB, including design, plans, permitting, cross sections, quantity calculations, cost estimates, utility coordination and bidding assistance.  The project included coordination with FDOT and the COFM.