Time: Jan 2009 – Jan 2010
Owner: City of Fort Myers
Construction Cost: $
Role: EOR for Value Engineering
Summary of work performed:
Strain pole design including pole, foundation, and two-point support wires, luminaire and sign support. Design included confirmation using second order analysis Finite Element Modeling to confirm vertical clearances of signal heads and guy wire verification (ATLAS and LARSA). Strain pole design per FDOT PPM and SDG.