Owner: Collier County, Florida
Start – Finish: February 2018 – November 2018
Construction Cost: $162,097.00
Summary of work performed:
HighSpans served as Engineer of Record to provide inspection and recommend remediation options to five locations where Hurricane Irma left the roads and sidewalks washed-out, as well as leaving stormwater infrastructure and other utilities exposed and damaged. There was also some degree of seawall failure. Challenges included on-going construction in the area including installation of new water, wastewater and stormwater infrastructure. HighSpans provided design and construction plans for permanent site improvements.