Time: January 2016 – April 2016
Owner:
Construction Cost:
Role:
Summary of work performed: The objective of this FDOT funded project was the elimination of a drainage structure at the intersection of SR 82 and Fowler Street in order to minimize the curb radius required in the design plan set. The project included Roadway Plan revisions including removal of an inlet and adding additional curb. The design includes revision to the key sheet, typical sections, quantities, plan sheets, intersection detail sheets (including existing elevations), drainage structures, and cross sections.