I-275 W. Tampa Drainage Box Culverts

Time: 2008
Owner: FDOT District 7
Construction Cost:
Role: EOR for Value Engineering
Summary of work performed:

HighSpans role on this project consisted of value engineering redesign of a one mile long drainage project to include pre-cast box culvert sections with cast—in-place joints.  HighSpans performed the role of Engineer of Record for the redesign, for quality control monitoring, and specialty engineer in charge of critical retaining wall design.  Value engineering cost proposal resulted in approximately $1 million savings to FDOT District 7 for this federally funded project.

 

 