Caloosahatchee River Bridge: I-75

Cost: $72 million
Start, Finish, Length of Contract: Began: January 2013, Finished: November 2015
Summary of work performed:

Javier was Senior Bridge Field Engineer for this Design Build Project for a contractor on this major Interstate Bridge project that included the Category II bridge for I-75 over the Caloosahatchee River, and approach bridges over Popash Creek, Tidal Creek and Tidal Marsh.  Main bridge is a 3,800-ft long, high level bridge with concrete and curved continuous steel girder spans over a navigable waterway.  Javier was in charge of monitoring pile driving and maintaining Pile Driving Logs, as well as testing concrete, inspecting reinforcing steel placement for footings columns, caps and deck.  In addition, Javier performed survey layout for the bridge components

 