Burnt Store Road Widening

Owner:
Start – Finish: January 2016 – Present
Construction Cost:$15,850,000

Summary of work performed:

Post-design services were provided for traffic signage and markings for TL-C criteria, design of two cul-de-sacs that were once connected to Burnt Store Road, 3D modeling for grade verifications on slopes and for super-elevation modeling on a shortened S-curve exit ramp.  HighSpans was also involved with design concepts for grade corrections of the water drainage and conveyance facilities, improving safety by clearing the roadway from water hazards due to the existing field conditions.

Burnt Store Road Widening