Cost: $4,200,000.00
Start, Finish, Length of Contract:6/1/2011 – 6/1/2013
Summary of work performed:
The project consisted of changing the road from a 4-lane undivided to a 6-lane divided with medians. Also providing ITS wiring, future irrigation stub outs, box culvert extenstions, broad crested weir construction, linear ponds and drainage.