Time: August 2010 – September 2010
Owner:
Construction Cost: under $100,00
Role:
Summary of work performed:
HighSpans Engineering performed inspection of the existing structure as part of a team effort to develop a plan for re-using the building after the new ARFF is constructed. Inspections included slabs/footings, columns, second floor, roof and exterior of the building. After completion of the inspections, HEI submitted a report and recommendation for inclusion in the overall project deliverables.