ARFF Facility

Time: August 2010 – September 2010
Owner:

Construction Cost:
under $100,00
Role:

Summary of work performed:
HighSpans Engineering performed inspection of the existing structure as part of a team effort to develop a plan for re-using the building after the new ARFF is constructed. Inspections included slabs/footings, columns, second floor, roof and exterior of the building. After completion of the inspections, HEI submitted a report and recommendation for inclusion in the overall project deliverables.

ARFF Facility