A1A St. Lucie Seawalls

Contact Name: Gerard Moliere, FDOT District 1 Structures Engineer
Phone Number: 863-519-2260
Email Address: Gerard.moliere@dot.state.fl.us
Cost: $29 million
Start, Finish, Length of Contract: 2009 – 2012 (3.5 years)

Summary of work performed:

HighSpans Engineering is Engineer of Record for the 1,000-ft twin bridges of the SR739 Metro Parkway extension project over Alico Road and Seminole Gulf Railroad.  Bridge consists of Florida-I Beams span lengths of up to 153-ft, post-tensioned hammerhead bent caps, and driven pile foundations.  Design challenges included working over the railroad, mass concrete, coordination with high voltage FPL Distribution lines.  Deliverables included bridge design and plans, load rating, temporary shoring post tensioning calculations, construction inspection services and documentation.

A1A St. Lucie Seawalls