Pan American Blvd Bridge Hydraulic and Structural Bridge Study

Time: 2019 – 2020
Owner:
City of North Port
Construction Cost:
$50k
Role:

Summary of work performed:
HighSpans served as Engineer of Record performing hydraulic and structural evaluation of existing Pan American Blvd bridge no. 175001 crossing Myaka Creek.  This three-span concrete bridge exhibited significant erosion and settlement at abutments and had unknown foundation (pile) depth as plans were not available.  Study utilized magnetometer equipment and soil borings to determine foundation depth and vulnerability to scour and included recommendations for immediate and long-term repairs.

Pan American Blvd Bridge Hydraulic and Structural Bridge Study