Vanderbilt Drive Stormwater Outfall Recovery

Owner: Collier County, Florida
Start – Finish: February 2018 – November 2018
Construction Cost: $162,097.00

Summary of work performed: 
HighSpans served as Engineer of Record to provide inspection and recommend remediation options to five locations where Hurricane Irma left the roads and sidewalks washed-out, as well as leaving stormwater infrastructure and other utilities exposed and damaged.  There was also some degree of seawall failure.  Challenges included on-going construction in the area including installation of new water, wastewater and stormwater infrastructure.  HighSpans provided design and construction plans for permanent site improvements.

Vanderbilt Drive Stormwater Outfall Recovery