Logo

News

 

The Collier County Gordon River Greenway ribbon cutting occurred November 6th, 2014. HighSpans provided structural design services for this nature trail and pedestrian bridge project.

 

 

 

 

 

 

City of Fort Myers Downtown Basin project (ribbon cutting November, 2013) has received numerous awards.  HighSpans provided structural design services.

 

 

 

 

 

 

The Bonita Beach Road Phase II widening project by Lee County and the City of Bonita Springs was completed the summer of 2013. HighSpans provided construction engineering and inspection services for this successful project.

 

 

 

 

 

The new six-lane Metro Parkway Extension, that runs from Six Mile Cypress Parkway to U.S. 41, opened to traffic on October 21, 2012. The SR739 Bridge over Alico Road (Mike Rippe Parkway) was designed by HighSpans Engineering, Inc. HighSpans also provided contractor quality control (CQC) throughout the duration of the project. There was a formal dedication ceremony on November 8, 2012.

I-275 West Tampa Drainage Project, with a mile of box cuvlerts competed.  HighSpans provided miscellaneous structures design services.

HighSpans was recognized by the FTBA as one of 2010’s Statewide “Best in Construction” for the I-75 Design-Build-Finance, iROX project, where it was responsible for the CEI and Bridge Design coordination for all 24 bridges and 324,000 tons of asphalt plant production along the 30-miles in Lee and Collier Counties.

COMPANY

BUSINESS UNITS

TEAM

RESOURCES

CONTACT US

Fort Myers Basin

Contact Us

 

 

 

Operations Address:

2121 McGregor Blvd.
Suite 200
Ft. Myers, FL 33901
239-433-3000

For Corporate Mailing Addresses:

Engineers@HighSpans.com

For Corporate Phone Numbers:

Engineers@HighSpans.com

Email:

General Issues:

Engineers@HighSpans.com

Careers:

Careers@HighSpans.com

Accounting:

Engineers@HighSpans.com

Website:

Engineers@HighSpans.com

Fax:

888.449.2462

ï¿¿ 2006 HighSpans Engineering, Inc. All Rights Reserved.