Logo
News
The new six-lane Metro Parkway Extension, that runs from Six Mile Cypress Parkway to U.S. 41, opened to traffic on October 21, 2012. The SR739 Bridge over Alico Road (Mike Rippe Parkway) was designed by HighSpans Engineering, Inc. HighSpans also provided contractor quality control (CQC) throughout the duration of the project. There was a formal dedication ceremony on November 8, 2012.
The Bonita Beach Road Phase II widening project by Lee County and the City of Bonita Springs was completed the summer of 2013. HighSpans provided construction engineering and inspection services for this successful project.
HighSpans was recognized by the FTBA as one of 2010’s Statewide “Best in Construction” for the I-75 Design-Build-Finance, iROX project, where it was responsible for the CEI and Bridge Design coordination for all 24 bridges and 324,000 tons of asphalt plant production along the 30-miles in Lee and Collier Counties.
 
 
COMPANY BUSINESS UNITS TEAM RESOURCES CONTACT US
Fort Myers Basin
Construction Engineering Inspection (CEI)
   
Construction Engineering Inspection
HighSpans provides construction engineering and inspection (CEI) services to DOT and government agencies, and CQC/Specialty Engineering services to Contractors to assure clients that their projects are built in accordance with their plans and specifications. We provide experienced inspectors, construction engineers and project managers for roadway and bridge projects, and airport and water control projects. HighSpans Inspectors are state certified in such areas as post-tensioning inspection, concrete, steel erection, drilled shaft and pile driving foundations, traffic control, and asphalt plant inspection. Our construction engineers specialize in structures and also participate in design, thereby adding value to the process and increasing benefit to the end user.
 
 
2006 HighSpans Engineering, Inc. All Rights Reserved.